Concurrency control and Degree of parallelism are the options available in Power Automate triggers and Apply-each controls.

Using Concurrency Control option, We can control number of flows to run in parallel. Without enabling the concurrency control, power automate can trigger multiple instances of a flow. But enabling the concurrency control we can mention number of instances to trigger and run in parallel. If we trigger multiple flows they will be in waiting stage.

To enable PowerApps Concurrency control, select Settings and click on Concurrency control as below.




After enabling the Concurrency control, there will be Degree of Parallelism option. This will allow how many flows to trigger at parallel. 

In the above case, only 25 instances can run in parallel. If we get more than 25 instances they will be waiting status as below.

Similarly we can enable Concurrency Control for Apply-each and it will run parallelly. 


Comments

Popular posts from this blog

Linksys Wireless Connection Failure

The security validation for this page is invalid. Click Back in your Web

Access Denied Host Header Sharepoint 2010 Windows Server 2008 R2